Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /home/content/33/4583733/html/index.php:3) in /home/content/33/4583733/html/wp-content/plugins/blog-designer/blog-designer.php on line 3392

Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /home/content/33/4583733/html/index.php:3) in /home/content/33/4583733/html/wp-content/plugins/blog-designer/blog-designer.php on line 3392

Warning: Cannot modify header information - headers already sent by (output started at /home/content/33/4583733/html/index.php:3) in /home/content/33/4583733/html/wp-content/plugins/index/index.php on line 54
BC Hydro Dawson Creek-Chetwynd Project | Northern BC Business

BC Hydro Dawson Creek-Chetwynd Project

026There is a new BC Hydro Project being built which is expected to service the new LNG projects in the Groundbirch area. The Dawson Creek/Chetwynd Area Transmission (DCAT) Project consists of:

  • Construction of Sundance Lakes Substation, a new facility located off Highway 97, 19 kilometres east of Chetwynd. Sundance Lakes will be built on Crown land and will allow more electricity to be transferred to the Dawson Creek area. It will also provide support to the Chetwynd area if one of the the transmission lines feeding Chetwynd is out of service.
  • A large expansion of Bear Mountain Terminal, located 12 km west of the city of Dawson Creek, converting it from a switching station to a full substation.
  • A small expansion to Dawson Creek Substation.
  • Two new double-circuit transmission lines. One 60-km double circuit will connect Sundance Lakes Substation to Bear Mountain Terminal, and the 12 km-long second double circuit will link Bear Mountain Terminal and Dawson Creek Substation.
  • A passive reflector near Chetwynd Substation, to reflect communication signals between Sundance Lakes and Chetwynd. The billboard-like structure, which stands about 15 metres high, does not require power.
Be Sociable, Share!

Short URL: http://northernbcbusiness.com/?p=2244

Posted by on 9:33 am. Filed under Alternative Energy, BC Economy, Chetwynd, Dawson Creek, Economic Development, North East, Oil & Gas. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

The Weather Network

Parse error: syntax error, unexpected ';' in /home/content/33/4583733/html/wp-content/themes/blognewsv1022/footer.php on line 30